Many people dream of their own home. It can be built from various materials. Cottages, private houses from aerated concrete are popular today. This material has a lot of advantages. Having decided to finance such a project, it is necessary to consider the average market value. This is an important issue.

Before concluding an agreement with the developer, it is necessary to consider all the nuances. If the price is significantly different from the average market price, do not trust the work of this company. Such organizations may significantly delay the process or fail to fulfill their obligations at all. What is the cost of building a house from aerated concrete , will be discussed in detail below.

The advantages of aerated concrete

The real cost of building a house from aerated concrete , installed on the market today, largely depends on the features of the entire process. The final price of the work depends on the choice of materials. For this reason, many customers choose aerated concrete. It has several advantages.

The cost of building a house from aerated concrete

Aerated concrete is one of the new building materials. It is lightweight and easy to use. This allows you to significantly speed up and simplify the process of building construction.

Aerated concrete belongs to the category of environmentally friendly materials. It has good sound and heat insulation characteristics. It is also a durable material. It does not burn and does not rot. However, the main reason why many customers choose aerated concrete is its reasonable price. At the same time, it is possible to carry out construction work when using it in almost any weather. Buildings up to 4 floors high are erected from it. It is a strong, reliable material.

Turnkey construction

The construction companies that exist today offer typical prefabricated aerated concrete house designs. The construction cost in this case is easier to determine. However, in some cases, the customer wants to create an individual project. In this case, the cost may increase significantly.

Calculate the cost of building a house from aerated concrete

Before concluding an agreement with the organization, it is necessary to consider all the nuances of the construction. In documentary form, the timing of each stage should be agreed. Many companies provide a standard project to their customers for free. This is normal practice.

At the same time, the contract may include the cost of geodetic reconnaissance of the area, the conclusion of contracts with organizations providing utilities, etc. As a rule, the client can choose materials for decoration, express wishes regarding the design of the premises, facade, site, etc. d.

What affects the cost?

The approximate cost of building a house from aerated concrete can be provided to the client at the planning stage of the construction of the selected project building. However, this price is not accurate. Its value is affected by a number of nuances. So, after conducting reconnaissance work on the site, it may be necessary to carry out a number of additional operations, for example, to create a well, a drainage system, to bring communications to the future home, etc. For a complex terrain, the price also increases.

Projects of houses from aerated concrete construction cost

The customer can choose several different construction options. He can choose a simple or complex home project. Since aerated concrete is a material that is easy to process, objects of varying complexity can be built from it.

Construction options

At the stage of concluding the contract, the client is invited to choose one of the three main options for building a house. If the customer’s budget is very limited, the builder can offer to create only the basic box of the building. In this case, the client of the construction company will carry out subsequent work himself.

The real cost of building a house from aerated concrete
The average cost is characterized by the construction of a house with exterior decoration. If the customer wants to get an object completely ready for operation, he can order construction for finishing.

The construction of the base box of the building

To calculate the cost of building a house from aerated concrete, you will need to choose one of the existing options that construction companies offer. For customers whose budget is quite limited, the option of building only the base box is offered. In this case, the client receives a fully finished building in which finishing work has not been carried out.

The cost of building a house from aerated concrete

The price of such construction averages about 14 thousand rubles / m². The process of building such a house is about 3-4 months. At the same time, the construction organization creates the foundation of the building, carries out all earthworks. The bookmark is executed in accordance with the communication plan.

Further, bearing walls and partitions are erected. The price necessarily includes the reinforcement of walls, window and doorways. Also, reinforced concrete floors are created, the building is insulated. Next, a roof is created, ventilation ducts, a chimney are held. When concluding an agreement, it is very important to pay attention to the quality of materials.

Exterior Building

The cost of building a turnkey aerated concrete house may include the external decoration of the building. The whole process can in this case last about 5 months. The average price of building a house with exterior decoration is from 19 thousand rubles / m².

Calculation of the cost of building a house from aerated concrete

In addition to the above stages of construction, the organization carries out a number of additional works. The developer must create an insulation layer for the roof. Plastic windows, entrance and interior doors are also installed.

The installation organization in this case will also carry out finishing work on the facade. At the same time, the basement is also made. You can choose the type of finish. For the base, natural stone is most often used. Overhangs are sewn, a gutter system is set up.

Some organizations also carry out cleaning of the territory, take out construction waste. The landscape of the site can be equipped with the participation of a professional designer. In this case, the facade decoration will coincide in stylistic design with personal territory.

Complete home decoration

The cost of building a house from aerated concrete can be about 24 thousand rubles / m². In this case, the installation organization puts into operation the building, which will be fully ready for operation. The construction organization undertakes to carry out all the above types of work. In addition, a fine finish is carried out indoors.

The cost of building a house from aerated concrete

With the participation of a professional designer, the interior of each room is developed. This takes into account the wishes of the owners of the house. Aerated concrete is an easy-to-use material. From it you can make various arches, partitions, create various decorative elements for the interior.

The construction organization enters into an agreement with all utilities. At the same time, installers connect all the necessary communications for life. This, for example, light, gas, water, sewage, etc. Inside the house, a screed is poured, a heating system is arranged. All finishing work is carried out. In this case, the house will be fully operational.

Project selection

The calculation of the cost of building a house from aerated concrete begins with the choice of a project for future construction. Almost every construction organization has a large selection of such solutions. Houses can be one- or two-story, have an attic floor. The cost of work depends on this.

If in the basic configuration of the project the building has a second attic floor, the price for 1 m² is from 14 thousand rubles. This price may increase depending on the complexity of the work, the selected materials.

If the project of the house involves the construction of a full second floor, the price increases to 15 thousand rubles / m². In this case, the finished project may cost about 1,500 thousand rubles. If the owners of the site want to build a turnkey house with all the finishing work, the price will be from 36 thousand rubles / m². In this case, within the time specified by the contract, a structure will be created that is fully suitable for people to live in it.

Cost of home

The cost of building a house from aerated concrete can significantly differ from the design price. This must be taken into account when choosing a project. Very popular with customers are both one-and two-story buildings.

The area of ​​the house may be different. As a rule, the average size of a cottage is about 90 m². Depending on the features of the project, such a building costs from 1,500 thousand rubles. However, when creating an estimate, the customer will be presented with a completely different price. If he agrees to conduct the turnkey construction process, the price of such a house will be about 3,000 thousand rubles.

It should be noted that if you want to change the list of materials included in the project, the price can increase significantly. As a rule, such organizations buy inexpensive funds for construction and finishing works. In order for the building to be in operation for several decades, and overhaul was not required for a long time, attention should be paid to the selection of high-quality materials.

Expert Advice

The cost of building a house from aerated concrete remains relatively low. When ordering a full list of services from one organization, the customer will pay less than when paying for services of individual organizations.

In addition, ordering a fully finished house will save you from many unforeseen problems and additional costs. All the nuances of the work are fixed in the corresponding contract. Therefore, the customer can immediately calculate the construction budget. An installation company that values ​​its reputation will not require additional investment. All actions of its employees will be spelled out in the contract. Therefore, it is very important to pay attention to all points of future construction, the exact dates of each stage.