The interior decoration of the house is considered a laborious and complex process. In order for the results of the work to be of high quality, some sequence must be observed. Home decoration is divided into draft and fair. The aim of the first is to eliminate the imperfections of the floor, walls and ceiling. It is possible to start its implementation only after dismantling unnecessary structures, cleaning the room area and erecting all the partitions. Even before the start of the rough finish, it is necessary to determine:
- The place of the future location of switches and sockets, equipment, electrical appliances, wall and ceiling lights, a computer, TV, phone.
- Type and size of interior doors.
- View, model, as well as the place of installation of sanitary equipment.
- Type, type of material for ceilings and walls.
- Type of flooring for all rooms.
Particular attention should be paid to laying warm floors. It is more suitable for decoration of tiles or porcelain. These materials conduct heat best. Screed is performed using dry modified mixtures. In places where furniture will constantly stand, a warm floor is not needed.
When choosing materials for roughing , quality and
properties of finish coatings. For example, different materials are used for floors in different rooms. Tiles, deck boards, carpets have different expansion coefficients, thicknesses, as well as the way of laying. In order for the floor surface to be smooth as a result, all these factors must be taken into account when determining the height of the screed. It is clear that home decoration is carried out starting from the ceilings. It has its own characteristics. Ceilings that have a deviation from the horizon of not more than 3 cm are leveled. With a larger slope, drywall is used.

Finishing the house in the second stage is the alignment and filling of the walls. For leveling, special mixtures or coarse putties are used. After that, bumps remain on the surface. Their depth should not exceed 3 mm. They are eliminated by puttying. Depending on the finish coatings, the volume of putty work varies. If the walls are prepared for painting, then they are puttyed 3-4 times. If for textured wallpaper, then enough 2 times. The primer is the final stage of the rough wall finishing work. After it, the surfaces are less prone to deformation.
Construction, home decoration is a long process. But when doing rough work there should not be rush and fuss. This is fraught with financial and time costs. It is necessary that each applied layer is well dried out. Then the connection with the next, whether it is putty, plaster, primer, will become strong. Categorically it is impossible to artificially dry out or leave building mixtures in direct sunlight. This will lead to internal stress and cracking of the surfaces.
If enough money was invested in a house with rough finishing, and the work itself was carried out without rush and fuss, then finishing finishing will be easier and faster. And for many years you donβt have to remember about the repair.