If you decide to connect a solid fuel boiler, you will certainly need a scheme for carrying out these works. When carrying out these manipulations, certain rules must be observed that are necessary for the long-term and safe operation of the equipment. Recently, climatic conditions began to change dramatically. Winter is getting colder, the temperature drops more impressive. If you decide to connect a solid fuel boiler, the scheme presented in the article will help you with this. The durability and reliability of the equipment will depend on how correctly the installation work is done. It is possible to supplement the unit will have a solid fuel boiler, as well as other devices that will satisfy the needs of the family. All these circumstances require a certain margin of space around the installation. If we are talking about the stock of free space, it is important to think about the wiring of the heating pipes, which will go from the boiler. To carry out installation work on your own is quite realistic, the main thing is to carry out calculations in advance and think through each stage.

Basic rules for installing the boiler

solid fuel boiler connection diagram

If a solid fuel boiler is to be connected, the circuit must first be considered, it will eliminate the occurrence of the most important errors. Initially, the master must figure out where the boiler room will be located, as well as how it will look. The room must have a good ventilation system, which will ensure the correct combustion process. It is also important what floor covering will be in this room, it should consist of concrete, the thickness of which is 5 centimeters or more. Installation work must be accompanied by the primary choice of location for the location of the boiler. The main disadvantage of such equipment is the need for installation in the place where there is a lot of area around the perimeter of the equipment for ventilation of the installation surface.

It is important to properly carry out installation work, which may be accompanied by some difficulties. If the unit has a high cost, then the installation work is best entrusted to professionals, otherwise you may face additional costs.

Installation technology

solid fuel boiler connection diagram

Connecting a solid fuel boiler, the circuit of which you will need before carrying out the work, provides for the implementation of several stages, among them the placement of equipment inside the boiler room can be distinguished. At the next stage, the pipeline system is laid, piping is made, at the final stage, the task of starting the boiler is.

Basic requirements for a boiler room

scheme for connecting a solid fuel boiler to the heating system

Regardless of whether installation work will be carried out by specialists or the owner of a private house, the wiring diagram for a solid fuel boiler must be observed. Otherwise, you may encounter problems that may arise during the operation of the equipment, they can cause serious damage not only to the boiler room and installation, but also to your budget. To ensure the safe operation of boiler equipment, it is necessary to choose a room with a minimum area of ​​7 square meters. When equipping the boiler with a ventilation system, it is necessary to choose a channel cross section of 80 millimeters, which should be 1 kilowatt of boiler power, which runs on solid fuel. It is important to ensure a safe regulatory distance from the wall to equipment, which should be 0.5 meters or more. After you have considered the connection scheme of a solid fuel boiler, it is important to think about what materials will be used for flooring. They must be non-combustible, a non-combustible material of the type of metal should be placed in front of the furnace opening. It is important to choose the correct diameter of the chimney, certain requirements are imposed on this parameter. You must comply with all fire safety standards, the only way to ensure the correct operation of the device. The efficiency of the heart of the heating system will depend on the correct installation and choice of the type of chimney.

Specialist advice

gas and solid fuel boiler connection diagram

The scheme of connecting a solid fuel boiler to the heating system, presented in the article, will allow you to perform work without the help of specialists. This will help save an impressive amount of money. However, in this case, you will not be able to count on a guarantee that applies to work and equipment. Depending on the power and dimensions, as well as the volume of the furnace, the boiler can be unloaded manually or by means of a mobile crane. In this case, it is best to ensure that the installation is carried out before the completion of construction work. Only in this way will you be able to eliminate problems with the roof and doorways.

Preparation before installation

solid fuel boiler connection diagram

The scheme for connecting a solid fuel boiler to the heating system will allow you to install and connect the boiler yourself. Before carrying out installation work, it is necessary to carry out calculations of the parameters of the boiler room, taking into account the principle of operation of the equipment and its features. The master must calculate the biases. It will be possible to make piping with a coolant, as well as solder the connecting elements, thinking about the location of the expansion membrane tank for heating. The system may have a boiler. Specialists or the owner of the house should prepare a welding machine, plastic pipes, a special soldering iron for them, pipe scissors and some other tools, as well as materials.

Installation procedure

wiring diagram for a solid fuel boiler with an electric boiler

The connection of a gas and solid fuel boiler, the scheme of which will help you carry out the work, is done after preparation for installation work. At the next stage, the equipment is installed at its final place, strapping is carried out, which is the most difficult stage. The master will have to connect the communications, this involves installing a pipe that supplies water to the system, as well as return pipes, you will need to connect a pipe that will supply water for heating. The connection diagram of a solid fuel heating boiler involves tying into the system some additional equipment as an expansion tank. Do not forget about the need to equip the chimney, as well as the launch of equipment.

Features of some connection schemes

scheme of parallel connection of gas and solid fuel boilers

A number of masters use a parallel connection scheme for a gas and solid fuel boiler. Not always in such cases there is the possibility of mounting a water pump to ensure forced circulation of the liquid. The reasons for this may be some factors. One of them is the frequent voltage drops in the network, which is quite difficult to deal with. Quite often, there are no power lines near the house. The price of such a system will be much lower due to the lack of additional equipment, however, installation will require compliance with biases. It is recommended to install safety lines between the tank and the boiler in the heating system on the outlet and inlet pipes. At the same time, this element must be placed closer to the water heater. Among other things, the master must make sure that the connection of the expansion tank with the boiler is made in the shortest possible way, it will not be possible to insert safety valves and taps on it. If you are considering a connection diagram for a solid fuel boiler with long burning, it is important to consider that in some cases it is not possible to raise the tank so that the circulation pump is cut into a straight pipe. This will open the possibility of suction in the upper radiator.

Additional wiring diagram information

The circulation pump must be installed on the return, or rather the return pipe. It must be mounted near the heating boiler. This is necessary so that in the event of a power failure, the system continues its work without coercion. This unit must be installed along the bypass, and if necessary, it can be disconnected from the network by blocking the bypass using cranes.

Conclusion

Previously, you must definitely consider the connection diagram of a solid fuel boiler. With an electric boiler, do not neglect the installation of a bypass, which is a jumper with a crane located between the return and supply. This element is necessary to return excess heated water from the battery to the riser.