The metal block house is made of galvanized metal sheets, which are coated with polymeric substances during the production process. Among the main advantages of this cladding can be identified strength, resistance to fading, environmental safety, the lack of need for care during operation, as well as resistance to mechanical effects. A block house made of metal is not at all afraid of temperature extremes; it is quite simple to install it; as a confirmation of this, this material has gained such high popularity in the market for construction products.
Specifications
The metal block house has a fairly impressive weight, it is customary to use it for exterior cladding. In the process of manufacturing the canvas, they get an offset drawing that allows you to achieve maximum similarity with natural wood. During installation, you will have to use a locking connection, which provides a secure fit. As a result, you can get a finish that has a natural look.
A metal block house can have a profile with two or only one crown. A distinctive feature of this type of cladding is the maximum similarity with a rounded beam. On sale you can find this material, which has all kinds of shades that mimic different types of wood.
Extra features
The metal block house has a full panel width of 211 millimeters. As for the useful width of the canvas, it is equal to 188 cm. The length of the finish can vary from 0.5 to 6 meters. If you decide to prefer a double panel, then you should expect a full width equivalent to 390 millimeters. The usable width is 360 millimeters, while the length remains the same.
Installation of steel block house
If you decide to choose a metal block house as the finishing material for the facade , the photo of which is presented in the article, then several steps have to be completed. The material is installed on a pre-arranged crate, as well as heat and vapor barrier. If you have to work with walls that were previously covered with plaster, it is important to analyze the coating for integrity and strength. In those places where the layers are poorly strengthened, it is necessary to get rid of them. If there is a facade made of wood, it will be necessary to treat the surface of the walls with antifungal substances.
Crate Installation
The metal block house, the photo of which is presented in the article, is installed on the crate, which is made of a metal profile or wooden bars. Siding can be located both vertically and horizontally. If the panels are supposed to be oriented horizontally, the component crates should be mounted vertically.
Insulation Installation
A metal block house under a log is most often mounted in tandem with insulation material. At the same time, in the cold season, the finish will well retain heat inside. At the stage of installation of the insulation, plate-shaped dowels should be used. If there is a need to use a heater in two layers, then it is necessary to ensure the dressing of the seams so that cracks do not form.
Installation of panels and additional elements
A metal block house under a log, the installation of which you can carry out yourself, must be strengthened using the building level. If there is a brick wall, the supporting brackets should be fixed using dowels. Fasteners are installed at a distance of 35 millimeters from the spoon row. As for the tychkovy, then you need to retreat from it 60 millimeters.
Using the screws on the brackets, install the L-shaped strips. The panels snap into place one after the other, and then are fixed with screws, self-tapping screws or nails. At the same time, fasteners should be installed in special holes. They are located at the top of the trim. Do not use a rigid mount when installing the panels. They should be able to expand and contract when exposed to temperatures.
Features of the work
The metal siding for the block house should be installed on the crate system. If you decide to use wooden blocks, then the cross section should be equal to 40 x 40 millimeters. If there is a metal profile, as well as in the case of its use for the frame, one should be guided by the dimensions of the distance between the elements in the range from 40 to 60 centimeters.
A wind-proof film is installed on top of the insulation, only then you can start siding the facade with siding. Begin these works by fixing the first bar. Panels are set from bottom to top. The resulting joints of the panels will have to be closed with a bar, while angular strips that can be external and internal are installed on the corners.
The house has window and doorways, which is why it is necessary to prepare special decorative strips to frame these components of the facade. A metal block house under a log, the photo of which is presented in the article, should be installed using a plumb line.
Lathing system installation recommendations
If you decide to use a metal block house under a tree, then for a successful result, you must take care to follow the rules for installing the crate. Wooden bars should be installed taking into account the width of the insulation. If it is mineral wool, then it will work most conveniently. This material is able to stand up tightly between adjacent rails.
In order not to measure each rail with a tape measure, which can take a lot of time, you should make a dimensional template using a bar. It will be applied to profiles in the future, which will increase the speed of installation work.
Before installing horizontal bars between them, lay the insulation and press with mushroom dowels. A film is stretched over the thermal insulation. It can be nailed with a stapler to a horizontal wooden grill.
On top of the insulated and film-sealed facade, you can install a second vertical crate, which will be used to fix the metal siding. With vertically oriented panels, installation must begin with the extreme rails. It is necessary to deviate 10 cm from the construction angle. This crate should be flat, among other things, be oriented at a right angle to the horizon.
Installation nuances
If you decide to choose a metal block house as the cladding, do-it-yourself installation of this deal can be easily done. After the extreme profiles are in place, you should proceed to the installation of intermediate ones. To do this, pull the thread between the lower and upper ends, which will act as a guide for the rest of the rails. In order to increase the pitch from the horizontal bar, any materials should be used, however, it will be best to use a bar of different thicknesses.
Conclusion
To install metal siding, you can use another technology for the manufacture of the crate system. This method involves the application of instructions for the arrangement of ventilated facades. The manipulations will not differ significantly from the above, however, metal profiles will have to be used. You can purchase a prefabricated subsystem of the ventilated facade, namely brackets and profiles. As an alternative solution, you can use the CD profile, mounted on perforated U-shaped suspensions. Before choosing a crate, you should seriously think about the material. For example, wood serves much less, but installing such a system is easier.