Connecting a house to gas: rules, procedure and requirements, necessary documents

Gasification of the residential sector outside the city removes a lot of household problems from the owners. Using blue fuel, you can completely solve the problems of heating and cooking. Another thing is that the process of connecting a house to gas is quite complex and multi-stage.

New gasification rules - what should be taken into account?

For two years (2017-2018), several changes were adopted in the Russian legislation governing the gas connection procedure. In general, they focused on simplifying access to gas supply networks - including by reducing the time for considering applications. Also, citizens got the opportunity to apply for connection to the backbone networks via the Internet.

Connection time was halved. In addition, the new rules for connecting gas to the house reduce the time for issuing project documentation from 20 to 15 days (workers). Payment approval for an individual project of technical connection takes place within 22 business days. The maximum connection period was also reduced in cases where only the actual introduction to the gas supply network is envisaged - from 12 to 3 months.

Also, in accordance with the updated rules for connecting the house to gas, service organizations must provide customers with information on work at all stages of the project. In particular, they should notify on the indicators of throughput on the supply line, which may affect the stability of the fuel supply.

Connecting a house to gas

What documents will be required?

The whole procedure begins with the collection of documentation that will allow you to prepare an initial certificate of technical specifications (TU) of the connection. At this stage, you can apply to the so-called โ€œSingle Windowโ€ or multifunctional center. At the stage of applying for technical requirements, the following documents will be required to connect the gas to a private house:

  • The situational plan of the site to which it is planned to carry out gas pipelines.
  • Copies of the passport and documents for the site and the house (in case the construction work is completed).
  • A power of attorney or other documentation if the application is submitted from a representative of the owner of the connection object.
  • If the planned gas consumption exceeds 5 m 3 / h, then an approximate calculation of the volume of fuel consumption will be required.
  • The consent of the owner of the gas pipeline network with which it is planned to connect the facility.

Also in some cases, the list of documents for connecting the house to gas provides for the topographic survey of the site if the first gasification is carried out. A graphic document must be prepared no earlier than 2 years before submitting a request.

The following is the conclusion of an agreement on the connection of the target facility with the gas pipeline. It can be issued not only with the direct organization - the owner of the supply line. For example, it may be a third-party service company engaged in the maintenance of the gas distribution network. After this, a contract is concluded for the development of the project and the installation work. This document is also not necessary to conclude with the immediate owner of the highway. However, under the contract, both the owner of the house with the site, and the person serving the network, must create the necessary conditions for the implementation of the connection.

Terms of connecting the house to gas

Technical conditions are important as a document, which in principle confirms the very possibility of technological connection of the house and the gas supply line. Moreover, the conditions may vary in relation to different groups of consumers. As already mentioned, the boundary point is the level of consumption of about 5 m 3 / hour. Owners who expect to meet this indicator belong to the initial group of private consumers. The following are the categories with fuel consumption above 5, 15 and 300 m 3 / h, which includes representatives of small business, medium and large industrial organizations.

Gas connection circuit

Why is belonging to one or another category important at the stage of approval of technical conditions? The fact is that the second and subsequent categories of consumers pose commercial tasks in the operation of communications, for which the requirements are automatically tightened. In particular, tougher land management procedures, technical and structural parameters of the network infrastructure, etc. are provided.

Conversely, the gas connection to the new house is carried out on the basis of a document with technical conditions that have been confirmed by the resource supplier. The verification procedure in this case is maximally simplified, since we are talking about communications with minimal load. In most cases, possible inconsistencies are eliminated by technical means at the initial stage of project development. One way or another, by the time the design decision is created, the following data should be indicated:

  • Location of the connection.
  • The location of the gas intake point.
  • Fuel supply line characteristics.
  • Gas pipeline configuration and material.
  • Technical parameters in the tie-in zone.
  • Diameter of a branch pipe for connection.
  • Gas pressure in the central system.
  • Climatic conditions.

Preparation of a design solution

The project is created by licensed organizations, which can also offer installation services. A comprehensive order of work, as a rule, is cheaper. In the overall structure of measures for designing and connecting a gas supply line, project development is of key importance, determining how the connection of the house with the gas source will be technically carried out.

This document contains explanatory notes with drawings that include the following information:

  • The configuration of the placement of gas equipment and other units of direct fuel consumption.
  • Route diagrams of gas pipelines on the street and in the premises.
  • The placement parameters of ventilation and smoke channels.
  • Clarifications and details that are individual in relation to a specific situation.

Usually, a project for connecting a house to gas is completed in 2-3 weeks. If there is confidence in the successful preparation of technical conditions, then in order to save time, it can be ordered at the stage of application submission. Experts recommend that future owners of the gas consumption point inform the design engineer as much as possible about the conditions and nature of the planned operation of the line. This will allow him to prepare a more informative and accurate document with a detailed description of the planned decisions.

Installation events

Laying a gas network for the home

When the project is ready, the customer must check it and give the green light to the implementation. On the basis of the prepared solution, installers collect estimate documentation for construction and repair and commissioning activities. When the execution of these documents is completed, a team of workers is sent to the object, performing the necessary operations for connection. It is important to note that installers do not insert and supply fuel. Their duties include laying the circuit, after which acceptance and insertion are made. According to the rules for connecting gas to a private house, after installation, the receiver leaves the facility. It draws up an acceptance certificate, on which the further course of the enterprise will depend. Either additional repair operations are carried out with the adjustment of the installation completed, or a gas supply agreement is signed. Then, after some time, the insert is made and the gas supply begins.

The cost of connecting to the gas distribution network

Specific prices are determined by many factors, including the volume of gas consumption, the remoteness of the object from the fence point, the area of โ€‹โ€‹the house, etc. Under the most favorable conditions, you can count on the amount of 10-15 thousand rubles. Beneficiaries of different categories are given discounts. What will be included in the minimum package of work activities? At a minimum, a supply line with a connection to the section from the main network will be provided. But if the distance from communications is more than 200 m, then the cost can grow at times. For example, a complex connection of a house to gas in the Moscow Region can cost 300-500 thousand. Prices increase if the customer also plans to carry out multi-level wiring in a large private cottage. On the other hand, turnkey work will be cheaper than a phased solution of individual tasks separately.

Tips for choosing gas equipment

Gas equipment connection

The safety of the operation of the line, its efficiency and productivity will depend on the technical means of gas consumption. Therefore, the selection of gas equipment should take into account several significant points:

  • The unit must be certified and have a technical passport.
  • Reliable connection of the equipment with the crane is ensured by a special rubber-fabric hose, which either comes complete with the equipment or is purchased separately. But it is important to consider that the rules for connecting gas to a private house prohibit the use of rubber hoses in a metal braid.
  • In addition to safety requirements and basic consumer qualities, do not ignore the ergonomic properties of a particular model. This applies to controls, remote control, interface characteristics, performance of temperature controllers and sensors.
  • Possibilities are provided for piping with adjacent heating, pumping, distribution or water supply equipment.
  • It is advisable to give preference to large manufacturers of engineering equipment, among which are Baxi, Ariston, Ferroli, VIESSMANN and AEG.
  • Installation, adjustment and replacement of equipment is carried out only by a specialized organization that has an agreement on the maintenance of in-house gas equipment. Owners of private houses conclude such an agreement individually.

Features of connecting an apartment building to gas

Gas wiring

Legally, the transfer of apartment buildings to the gas supply system is implemented at the municipal level, taking into account safety standards and requirements for comfortable living of citizens. From a technical point of view, the difficulty may lie in replacing communications designed to provide liquefied fuel with systems designed to be connected to natural gas sources.

If at the time of the project development titanium and gas water heaters were already used in apartments for hot water supply, then technically the problem is solved by simple reconstruction of gas supply, but also at the expense of the users themselves. In any case, the procedure for connecting gas to the house involves a meeting of an initiative group of owners with the participation of representatives of the managing organization. Residents instruct the management service to take specific measures regarding the transfer of communications to the possibility of supplying natural gas.

Autonomous gas supply as an alternative

Connection to an autonomous gas source

The solution is suitable for private homeowners who for one reason or another do not plan to connect to the central gas supply network. Such a solution justifies itself in the case of unsatisfactory performance of an accessible gas pipeline or even in the absence of the ability to connect to it - as a rule, due to the long distance.

The solution is autonomous gas supply, which is usually sold through a gas tank. This is a special large-capacity tank (3-10 thousand liters) that acts as a fuel source. To connect the house to gas through this tank, a special project is also required, after which technical operations are performed, but in a much smaller volume. In general, the cost of such a project will also cost a lot - mainly because of the price of a gas holder, which can amount to several hundred thousand rubles. In addition, periodic filling of the tank with fuel will be required. The gas tank itself is installed on a site in a special pit. At this stage, installation activities require serious work, but you canโ€™t do without them.

Conclusion

The organization of gas supply within the framework of own home ownership is one of the key conditions for its full-fledged household and household operation. The current procedure for connecting gas to a private house, although it is simplified in relation to previous procedures, but also provides for the implementation of a number of troublesome measures. At a basic level, the preparation of the necessary documents is required, which will allow to start the process of solving the problem. This will be followed by a set of organizational and technical measures, the success of the whole event will also depend on the quality of production.

Home gas supply control unit

For many owners of suburban cottages, the problem of gasification is still the financial side of the issue, since laying networks in remote villages is quite expensive. The situation is complicated by the fact that at the first stages it is not always possible to calculate the full estimate of the project. Therefore, it is extremely important to consider this aspect even before the start of organizational procedures.