How to fill the floor in the apartment? Good advice

Repair in an apartment usually starts with the floors, so a lot of questions arise. In this situation, it is important to do everything correctly. The question "how to fill the floor in the apartment" is very important, since usually the floor is not perfectly flat.

Many people do not know how to do it right. First you need to get rid of the old coating, if any. After you get rid of it, you need to clean the base of the floor and remove all dust. The entire surface of the adjacency of the floor to the walls must be covered with waterproofing mastic. It is important to pay attention to the joints, as well as the places of passage of pipes and all kinds of cracks. They pose the greatest risk of leaks. Speaking about how to fill the floor in the apartment, it should be noted that, after you process everything with mastic, you need to make a roll of isoplast flooring, which gives more reliable protection, as well as providing waterproofing of the floors. Only then can we proceed to further work.

How to fill the floor in an apartment
If we talk about how to properly pour concrete floors, then it is worth noting that at the next stage you will need to install beacons that correspond to the level of the future floor. This is done using a special profile, which almost does not bend, allowing you to ensure a flat surface. Under it, it is necessary to put chopped drywall squares to get the required height, and then you can grab it with gypsum, which will fix the beacons.

How to fill a bulk floor
When the installation of these elements is completed, it will be clearly visible at what level the floor will rise, as well as what space you need to fill. If the rise in floor level will be to a height of more than 5 centimeters, it is recommended to add expanded clay. This is done so that there is not too much load on the ceiling, in addition, it perfectly absorbs moisture.

How to pour concrete floors
Considering the question "how to fill the floor in the apartment", it must be said that then you can start working directly with cement, but before that you need to prime the surface. The solution is made from a dry cement mixture, which is quite realistic to buy on the construction market in your city. To begin with, a rough floor is poured , which should dry well before you start the rest of the work. You can walk on a fresh screed in a day, however, it is too early to lay the cover.

Now you can consider the question of how to fill the bulk floor? When the rough screed is completely dry, you can start pouring with a self-leveling solution. The floor should dry thoroughly again. After that, the ideal surface will be ready, and then on it you can lay any coating that you like: laminate, linoleum, parquet board, ceramic tile or something else.

Now that you know how to fill the floor in the apartment, you can do it yourself. Then you can start the rest of the work in the room. It is important to remember that when buying a variety of building materials, you need to look at their shelf life, since many dry mixes have very limited periods.

Source: https://habr.com/ru/post/F11511/