The Norman construction company has existed in the economy class housing market since 2004. In her work, she is guided by the postulate that each family should have a separate apartment.
CJSC "Norman"
CJSC "Investment and Construction Group Normann" from the date of its formation was part of the holding "SNZK". Having built up capacity and gaining experience, in 2006 she began to independently engage in the development of real estate (development). The company is building affordable homes for middle-income residents.
Normann is both a customer, investor, developer and general contractor. This means that the company carries out the entire construction process, starting with the design and execution of permits and ending with the commissioning of facilities. In her activities, she uses new technologies and developments. The region in which Norman operates is St. Petersburg and the Leningrad Region.
House for rent
- The Neva Vertical.
- "Vitebsk".
- "Shushary."
- Kolomyagi Breeze, 5-storey building.
- “Two Captains”, 22-storey.
- "In Vsevolzhsk."
- "Excellent" in 22 floors.
- Izhora-Park (the second phase was commissioned, but the apartments have not yet been settled).
Residential complexes under construction
- "Desyatkino", "Desyatkino 2.0" (Vsevolzhsky district).
- “On Zarechnaya” (Vyborgsky District, St. Petersburg). 1st stage commissioning - 1st quarter 2016, 2nd – 4th quarter 2017 year
- "Three oranges." 1st stage - 4th quarter 2015, 2nd - 1st quarter 2016 year
- "Bright". 1st stage - 1st quarter 2017 year
Prospects
Currently designed LCD "Normandy" (Kolomyagi) and "Moroshkino". Norman plans to become a leader in the construction of economy class apartments in its region. To this end, she intends to work in other areas and provide customers with additional services.
LCD "Desyatkino 2.0"
Back in July 2014, he received permission to build the first phase of this Normann housing complex. The construction company Desyatkino 2.0 is building Murino in the suburbs of St. Petersburg. Two weeks later, she began to sell apartments, attracting the money of future residents. Permission to build the second phase was received in September of the same year.
Norman is not the only developer on this site. LCD "Three whales" erects "SU-155", as large as the "Normann" construction company. Desyatkino 2.0 is a short walk from the Devyatkino metro station. The infrastructure of the microdistrict is expanding. Planned equipment playgrounds for children and adults.
According to the schedule, the first stage should be completed in the second quarter of 2016, the second - in the fourth quarter of 2017. But it is not known whether the Desyatkino complex will be ready by the deadline. "Norman" in the spring delayed the progress of construction for three months.
LCD "Izhora Park"
Not only in the open field is building a Norman house (construction company). Izhora Park is being built in the historic center of Kolpino. It will consist of five brick monolithic buildings, 12- and 18-story. The first stage (two buildings) was commissioned, the term of the second stage is the 4th quarter. 2015 year. The price of a one-room apartment is 1.85-2.86 million rubles.
The ceiling height in these houses is 2.7 m. It will make it possible to install furniture and live comfortably. The interior doors in the apartments will be wooden, the entrance - metal.
In the decoration of the facade plan to use ceramic brick. Heating will be carried out using an autonomous gas boiler.
Planned traditional parking. The territory of the complex will be guarded. Each house will have a concierge, in apartments - intercoms with the possibility of subsequently installing video surveillance.
The Rybatskoye metro station is located five kilometers from the construction site. Bus stop - 70 meters from the construction site.
Major infrastructure facilities are nearby. There are no entertainment facilities yet. Although, after the commissioning of the complex, they can be located on the ground floors, as indicated in the development plan provided by the Norman construction company.
Responses of residents of the neighboring microdistrict claim that an underground river passes under the complex . These places have long been called swamps. Because of this, it’s supposedly impossible to build here. But the examination did not confirm these opinions. Buyers hope that the developer has strengthened the soil under construction.
The second section was commissioned three weeks after the plan (in January), but settlement will occur before July 2015, as the Norman construction company assures.
Customer reviews indicate that many people buy several apartments, especially for resale or for rent. They believe that this is a profitable investment.
Initially, when they were still digging a pit, the Norman construction company offered relatively low apartment prices. Customer reviews indicate that it is at this moment that it is profitable to buy an apartment there, having paid all 100%. Then prices begin to rise monthly like a snowball. And at the time of delivery they reach the value of the apartments of the remaining developers.
A mortgage can be obtained at a bank owned by the Norman construction company. The bank takes so high interest that it is more profitable to take a consumer loan. Reviews say that buying an apartment by installments is unprofitable.
The object is being built with a delay of six months. Employees explain it as inconsistency with the authorities of the project for the planning of territories.
LCD "On Zarechnaya"
In the second quarter of 2015, the first phase of the Na Zarechnaya complex should be commissioned. It is also erected by Norman (a construction company). Prices are acceptable: a square meter costs from 63 thousand rubles.
The complex in Pargolovo will consist of five residential buildings, the construction of which is carried out in three stages. In December 2014, “Normann” began to build the second phase of the residential complex “On Zarechnaya”. It will have two buildings and will consist of houses on the 19-25 floors, equipped with modern high-speed elevators, metal-plastic windows, glazed balconies. In houses of the third stage they plan to carry out panoramic glazing of loggias. The complex will operate food and hardware stores, a fitness center, a pharmacy, and office premises. They plan to garden the yards.
The territory of the housing complex will be protected by a fence. The presence of intercoms will help to avoid access by strangers. For parking, parking and outdoor areas will be built. Parnas Metro Station is 9 km away.
Apartments are planning to rent without finishing. The price of a studio with an area of ​​22 m 2 is 1 million 35 thousand rubles. The average delay in the delivery of Norman facilities is 3 months, and the maximum is 15 months.
In January 2015, the construction process of the Zharkiy residential complex was launched, which should be completed in 2017.
February 2014: permission was obtained for the construction of houses, mainly consisting of studios, in the residential complex "Moroshkino" (Vsevolzhsky district). The deadline is the end of September 2016.
Reviews
Many buyers like the Norman construction company. Reviews indicate that the deadlines are postponed for a short time. Therefore, people opt for the apartments of this company. True, these are mainly those buyers who are not going to live in them.
But those for whom this apartment is the only one who leaves not so welcoming reviews. It is reported that in the Izhora Park residential complex a house was commissioned without heat and electricity. After the settlement, it turned out that external networks had not yet been built. Interest holders made a fuss and wrote to all authorities.
Similar problems were with the LCD "Excellent". Having lived only a year, residents discovered pipes through which water refused to flow, and found rust and dirt inside them.
In a low-rise complex in Vsevolzhsk, electricity is supplied from generators for a year and a half. Storm sewage is not completed there. Because the cellars after the rain floods with water.
In 2012, the company began selling apartments and building the residential complex “On Zarechnaya” before it received permission. This led to problems.
Construction companies of St. Petersburg
Among several dozen companies involved in construction in St. Petersburg and the Leningrad Region, the best are:
- Setl City.
- Group of companies "CDS".
- Group of companies "Etalon".
- “LSR. The property".
- YIT House.
Companies with low-cost apartments:
- "Policy".
- Mavis.
- Setl.
- "Patriot Neva".
- Petersburg Real Estate.
16 companies did not delay a single construction site. Among them are “Patriot-Neva”, “Otdelstroy”, “Petropol”, “Northern City”, “Baltic Monolith”, “Mavis”.