Plumbing in a private house. Device and installation of water supply system

During the construction of individual housing, one of the important points is the installation of water supply and sewage. These two systems are closely interconnected. Is plumbing in a private house a norm, not a luxury item? as was more recently. Modern man does not think of his existence without amenities, and this is understandable.

do-it-yourself water supply in a private house

An interested person can make a plumbing in a private house with his own hands. It is important to correctly calculate and design it at the design stage of the house. During the construction of the foundation, it is necessary to complete the strobes and prepare the channels for laying pipes. At the same stage, a connection is made to a centralized network, if possible. Pipe insertion and retraction is performed.

Often the water supply in a private house, especially when it comes to suburban construction, involves the organization of an autonomous water supply system . In this case, there can be two solutions - a well or a well. If the water supply in a private house is planned for seasonal short-term use, then the well can satisfy the requirements. This option will be cheaper than drilling a well, but we must remember that the water quality in the system will be significantly worse. Most likely, this liquid can be used only for technical purposes, or subjected to multi-stage cleaning.

If the water supply is intended for regular use, including in the winter season, the well will be the best option for an autonomous system. Water quality is much higher compared to a well. In addition, it is recommended to install filters for cleaning at the inlet. This will favorably affect the work of all, without exception, appliances that consume water, such as a washing machine, dishwasher, and even an iron. Also, in the kitchen, an additional purification filter should be installed to obtain potable water.

plumbing in a private house

Mounting

Water supply in a private house can be divided into two main components - the outer part and the inside. It does not depend on the connection method.

As already mentioned earlier, even at the stage of developing a house project, it is necessary to prepare and carefully think over a water supply and sewage project. Work on laying the outer part of the network can be performed already at the stage of foundation work. At the same time, pipes leading to the house should be laid underground. There are two options: either below the level of soil freezing, or the pipes must be additionally insulated. This is done in order to avoid freezing in the winter.

plumbing device

Work on laying communications inside the building should be carried out before the start of interior decoration, in order to be able to test the system without causing damage in case of leakage. For a more rational operation of the pumping station, when it comes to an autonomous system, it is customary to use storage tanks, from which water flows directly into the devices. Direct pumping from the source to the device is advisable only in case of irregular use. Otherwise, this leads to additional energy consumption and wear of the pumping system.

Source: https://habr.com/ru/post/F15865/


All Articles