Working with wood requires certain knowledge and skills from builders. It is difficult for a person who does not have sufficient experience and special equipment to mount such material. But the lining is knocked out of the total mass. It has already been processed properly, so its installation is even a layman's power.
There are several ways to sheathe a room with a clapboard. Each of them has its own advantages and disadvantages. Making fasteners with a stapler is considered one of the simplest methods. It is easier for a novice to apply this approach in their work. How to nail a lining with brackets of a construction stapler will help sort out the advice of experienced professionals. Even without special skills in such an installation, the novice master will be able to do the job well. To do this, read the step-by-step instructions.
The essence of the method
Asking the question of how to nail a lining to the wall with a stapler, you should familiarize yourself with the recommendations of specialists. This approach uses a tool identical to a clerical stapler . Its construction variety also has a compartment for brackets and a retainer. This is a flat pressure panel.
The staples in this tool are understandably more massive and stiff. When pressed, pressure is exerted. The bracket leaves its compartment and is fixed in the material. Moreover, the fastener becomes at an angle of 45 degrees. Further, the ends of the bracket are pressed under the influence of the same pressure. The fastener locks tightly in the material. Fixation nodes are strong. At the same time, work is performed quickly and without much effort. This method is quite popular today. It’s easy to master it. You need to know a few subtleties.
Features of work
Getting acquainted with the information on how to nail the lining to the wall, ceiling, it is necessary to consider the features of this process. In this case, it is necessary to take into account the features of the room and the type of base. Depending on the material of the wall, the type of frame is selected. Without it, the lining can not be installed.

If it is planned to be mounted on the ceiling, the frame must be reinforced. When installing it, additional materials are also used (glue and kleimers). The stronger the support system under the lining, the more durable the cladding will be. The process of creating the frame is given special attention. When choosing materials, the following point is taken into account: whether boards and profiles will be exposed to temperature fluctuations (for example, in a bath) or high humidity (for example, in a shower or a bathroom). Even under favorable environmental conditions, a frame is necessary. Otherwise, the lining will become loose over time.
Preparatory work
Before mounting the frame, you must prepare the base. When deciding how to nail a lining to a brick wall, concrete or other materials, it is necessary to investigate surface irregularities. If they are very large (exceed 10 cm), it is necessary to putty cracks, dents, bulges.
Also, to avoid the formation of fungus, other microorganisms and pests, the surface is treated with an antiseptic primer. This is especially important in a bathhouse or bathroom. After making sure that the base complies with building codes and requirements, proceed to the next step.
Frame mounting
Studying how to nail lining to the wall, it is necessary to consider the technique of mounting the frame. First, with the help of a meter and a level, the lowest point is found on the base. It will be the source during the installation process. A horizontal line is drawn from this point around the perimeter.
Then, using a level and a building angle, a vertical straight line is drawn. According to the marking on the base, metal profiles or wooden battens are mounted . In the latter embodiment, the material must be impregnated with a fire-fighting solution and an antiseptic. The metal frame is more reliable and durable. But its cost is more than a wooden base, and the work is more complicated.
Additional materials
To understand how to nail a lining with a stapler, you should consider each action. After mounting the frame, it is necessary to insulate the walls or ceiling. This is especially important for a bath. Heat will not quickly leave the room. For this purpose, mineral wool or other special materials are used. Polyfoam for internal installation is not used. Also, when installing the lining in a humid room, it will be necessary to lay a layer of waterproofing. So that the structure does not loose over time, an OSB sheet is first attached to the frame. It can be only 6 mm thick. This is enough to give rigidity to the skin.
Next, you need to prepare the glue. Without it, fastening with a stapler or other mounting elements will be fragile. Even when hardened, the adhesive is flexible. Therefore, under the influence of temperature and humidity, the lining will remain flat.
Installation of wall paneling
Studying the question of how to nail a lining, you should consider in detail the stapler method. To keep the casing firmly, it is better to use “liquid nails”. The lining sheets are fastened so that a bracket easily enters into them at an angle of 45 degrees. Depending on the thickness of the casing and the material of the frame, 4-6 staples are required per sheet. They are installed at the bottom of the lining. This makes the fasteners invisible. Glue will give strength to the entire structure. Using a stapler is quick and easy. This method is applicable even for ceilings.
Ceiling lining
Modern building materials allow you to mount the lining with a stapler even on the ceiling. To do this, you need to take into account some nuances. Being interested in how to nail the lining to the ceiling, it should be understood that the whole system must be firmly held on the base. After all, with insufficient strength at one point, it can fall on the heads of the owners. To prevent this annoying situation, a metal frame is mounted on the ceiling. The OSB sheet should be about 10 mm thick (larger than on the walls). This will further strengthen the design. The use of glue in the process of fixing the lining with brackets is mandatory. Work takes longer, but the cladding will hold firmly to the frame.
Final stage
When you independently perform the lining of the premises, you can get some gaps between the boards in the corners. Solving the problem of how to nail lining to the ceiling in the bathhouse, on the walls, it is necessary to be prepared for such a situation. This is not a problem.
The gaps between the sheets at the corners must be covered with window glazing beads, rails or special corners. It is better to glue these elements, rather than punching them with brackets. For the ceiling, wooden baguettes are used to match the lining. This will hide the bumps. They are inevitable in any case. Aesthetic effect will be better. The skin will look neat. Being in such a room is pleasant for the owners and their guests.
Having considered the technique of how to nail a lining to a wall or ceiling with a stapler, you can do all the work yourself. It is carried out in stages. Taking into account all the features of the process, familiarizing yourself with the recommendations of experienced specialists, you can sheathe the room with high quality. The lining will firmly hold on to the base. The life of the coating will be long. Even a novice master will be able to independently complete all the stages of work.