How to make the floor in the bathhouse correct

The construction of the steam room consists of several stages. The adoption of bath procedures with a good flooring is much more pleasant and comfortable. Therefore, in the locker room they make a double floor, that is, first a rough floor, and on top - already a fine flooring. Traditionally, a wooden or concrete floor is equipped in a Russian steam room . When installing the foundation, they always think about how to make the floor in the bathhouse so that it is warm?

Wooden floor

How to make a floor in the bath
The classic wooden floor does not lose its relevance. This material is environmentally friendly, and wood always creates a feeling of comfort. Wooden surfaces are aesthetically attractive, they are associated with stability, solidity. English scientists say that the presence of natural wood in the room is the prevention of asthma.

How to make a floor in the bath so that this is the best option? One of the best flooring is double wood. Two types of wooden bases are mounted in the bath - leaking and non-leaking. Leaks must be dried all the time, so they often use the second option. Non-leaking bases are mounted with a slope so that water flows into the drain hole. In addition, they should have a rough floor.

Rough floor

Concrete floor in the bath
How to make the floor rough in the bathhouse correctly? Logs are laid on pre-prepared concrete poles. Supporting chairs are made of wood, only underneath they must fill in a concrete platform. The distance between the beams should be 60 cm. When mounting a leaking flooring in a bathhouse, they do not make a slope, and non-leaking one is laid under a slope. To get such a bias, cuts are made on the uneven bars. You can’t save on beams, the thickness of the lag depends on the distance between them and their number. In the place where the furnace will stand, it is necessary to further strengthen the bars. Then lay the boards, insulation and vapor barrier. After that, the bars are strengthened, and a finishing floor is installed on top.

The concrete floor in the bath has a drawback - it is cold, so it must be insulated. First of all, you can put a concrete base in 2 layers, and between them thermal insulation. Crushed stone should enter the bottom layer. Before pouring, guide beacons are installed along the room. Level do check in all directions. Concrete mortar is poured from the corner of the room. Having smoothed the first batch of the solution, prepare the next one. It is necessary to ensure that there is no wavy transition when filling the floor.

Warming

How to make a floor in the bath
How to make a gasket floor in a bathhouse? Expanded clay, glass wool and perlite are used as heat-insulating material. The gasket is prepared from the following components: perlite (3 buckets), cement (1/2 buckets) and water (1.5 buckets). The resulting mixture is poured onto concrete in a thin layer. Such a foundation is considered reliable and durable.

Specialists also make water heated floors. They consist of pipe systems that are in the screed. They also make electric warm bases by mounting electric cables.

Ventilation

This is a very important point that needs to be paid special attention. To do this, make a ventilation hole in one of the walls, and a box of tin or wood is mounted at the bottom. At the same time, one end of the box goes to the roof, and the second goes down. Any owner of the bath - provided that he built it himself - can share information from personal experience on how to make the floor in the bath.

Conclusion

A wooden flooring decorates the steam room - it becomes comfortable in it, and the body receives a charge of vivacity and the prevention of health for many years. If professionals take up the matter, the floor in the bath will be installed correctly.