How to fill the foundation? Advice

The question "how to fill the foundation?" It is very important, since in the process of construction of any buildings there are no moments that can be called insignificant, because each of them depends on how good the foundation of the object and its subsequent fate will be. Pouring concrete formwork with concrete is one of the key stages of construction. You can start this stage if all excavation work is completed, and the formwork and waterproofing are installed, in addition, a reinforced frame should be ready.

How to fill the foundation
If we talk about how to properly fill the foundation, then it is worth considering several ways. The choice of a particular one is dictated by the difference in the cost of money and time. The most economical, but at the same time laborious, is to fill the foundation on your own, when concrete is prepared directly on the site using a compact concrete mixer. Such equipment can be of different volumes, from 50 liters or more. The number of cycles will depend on the performance of this equipment. Speaking about how to properly fill the foundation, it is worth saying that it will be very difficult to do all this work with one pair of hands, especially when it comes to the large size of the future structure. Typically, a concrete mixer is located in the immediate vicinity of the pouring site. It is desirable that there are no more than two layers in the foundation, if this is not possible, it will be more correct to fill it with parts to the height of the formwork. Each concrete layer must be compacted so that cavities do not form in it. For this procedure, you can use the means at hand, or rent a deep vibrator that can significantly reduce the amount of work.

How to fill the foundation of the house
Speaking about how to properly fill the foundation, it should be noted that after laying the last layer, it is necessary to cover the entire structure with a protective layer of roofing material or film.

How to fill in the strip foundation
Consider another way. You can call a concrete mixer. This option is more expensive than self-pouring, but in one approach it allows you to fill the foundation for the whole house, while the quality of work will be as high as possible. One concrete mixer is capable of delivering 4-8 cubic meters, and if necessary, you can order several machines, it all depends on the need for concrete. The preparation process in this case comes down to making special gutters. They allow you to pour the mixture into the most secluded formwork places.

Speaking about how to properly fill the strip foundation, it is worth noting that, using a concrete mixer, it is necessary to distribute the solution at several points of the formwork. This is the only way to obtain uniform distribution of the mixture in the required volume. If you fill at one point, it will take a lot of effort to distribute it throughout the formwork.

You can use a concrete pump. This option is relevant only if there is no way to approach the construction site, and the use of a gutter, the length of which will be several tens of meters, is irrelevant. In this case, you should be prepared for significant financial costs.

Now you have an idea of ​​how to properly fill the foundation of the house.