Can tiles be laid during repair?

Starting to facing the walls and floor of the bathroom, many people ask their exciting question: "Is it possible to lay tiles on tiles without removing the old one?" First you need to find out what exactly is being discussed. If this is ceramic tile, it is worth noting that this finishing material is considered the most moisture resistant and it is better to use it in rooms with excessive humidity. The water resistance of the tile makes it indispensable for facing not only the walls of showers and bathrooms, kitchen work areas and countertops, but also when using this material as a floor covering.

Can tiles be laid on tiles?

Can tiles be laid on tiles when wall covering?

Tiles are laid on almost any surface, and the material from which it is made plays a special role. However, when facing the walls to the question of the townsfolk: "So is it possible to lay tile on tile?" The answer of experts will be categorical: β€œIt is impossible!”

The fact is that the tile surface has a very low adhesion coefficient. That is, the probability of its strong connection with another material is practically zero. Thus, having a sufficiently large weight, the tile on the vertical wall will not hold and will certainly fall.

how to lay tiles on the floor in the bathroom

Flooring: can tiles be laid on tiles?

But if you use the tile in the bathroom or toilet, then such manipulations are quite possible. However, for the best result in this case, it is recommended to use a special primer. It includes not only sand and cement, but also additional binders that guarantee the best adhesion. Today you can easily buy a primer of any price category of domestic or foreign production.

How to lay tiles on the floor in the bathroom?

how to glue tiles on the floor

To perform this work, two fixing methods are used: using cement mortar and using glue. The second option is considered less labor intensive and much more practical. So, let's talk about how to glue tiles on the floor, and what is needed for this.

At the beginning of the work, it is necessary to properly clean the surface of the old tile from dirt and thoroughly degrease it. Then, using a paint roller or brush, apply the primer immediately to the entire surface. The consumption of material necessary for work can be calculated in advance. As a rule, it is equal to 300 g per 1 square meter of floor surface.

After applying the primer, you must wait until it dries completely. It usually takes about three hours. Then you can begin the process of laying tiles on the floor. To do this, a pre-prepared adhesive should be applied to the surface of the tile with a notched trowel, after which it must be pressed firmly to the floor. As soon as the whole tile is laid, you need to process the seams, that is, with a rubber spatula, evenly grout the joints of the tiles. After it dries, the floor must be wiped with a damp soft cloth or sponge. Layed using glue, the floor tiles will be ready for use in just two days.

Source: https://habr.com/ru/post/F5795/


All Articles